When do I pay for the permit?
The plan review fee is required at the permit submittal, the remainder of the fees are required at the permit issuance.

Show All Answers

1. Do I need an architect to design my project?
2. Do I need an Engineer to design my project?
3. How much will the permit cost?
4. When do I pay for the permit?
5. Do I need a soils report for my project?
6. Can I do an open hole soils report after excavation in lieu of a soils report prior to the permit issuance?