Required Inspections

All permitted projects are required to undergo a series of inspections to demonstrate conformance with approved contract documents. The number of required inspections varies with the scope of the project.

Approved plans must be on-site for all inspections. You must obtain a permit before completing any work or scheduling an inspection. It is important to ensure that your inspections are scheduled under the appropriate permits.

Below is the full list of inspections we perform, grouped by the type of permit. 

Building Permits


Permit Type/Prefix
Inspection
Scheduling Code
B Construction Barriers 090
B Site Set Back 100
B Footing 110
B **Foundation Wall (Inspection Required in Silverthorne Only) 120
B **Foundation Damp Proof (Inspection required in Silverthorne Only) 130
B Foundation Drain 135
B Concrete Slab 140
B Foundation Insulation 150
B Masonry Grout 160
B Framing 200
B Insulation 210
B Building Drywall 220
B Fireplace Chase Drywall 230
B Roofing 240
B Exterior Drywall 270
B Building Final 260
B Miscellaneous 265
B Investigation 275
B Mobile Home Gas Piping 295
B Final Grading 745

Plumbing Permits


Permit Type/Prefix
Inspection Scheduling Code
P Underground Plumbing 300
P Rough Plumbing 320
P Plumbing Gas Piping 310
P Final Plumbing 330

Fireplace Permits


Permit Type/Prefix Inspection Scheduling Code
F Fireplace Rough 452
F Fireplace Gas Piping 451
F Fireplace Final 453

Mechanical Permits


Permit Type/Prefix Inspection Scheduling Code
M Rough Mechanical 400
M Mechanical Gas Piping 410
M Mechanical Fireplace 420
M Final Mechanical 430

Electrical Permits


Permit Type/Prefix
Inspection Scheduling Code
E Temp Heat Set 510
E Rough Electrical 520
E Underground Electrical 540
E Final Electrical 530

Temporary Power Permits


Permit Type/Prefix
Inspection Scheduling Code
TP Temporary Power 500


Hot-Tub-Only Permits

Permit Type/Prefix
Inspection Scheduling Code
HT Hot Tub Final 261

Window Permits

Permit Type/Prefix Inspection scheduling Code
W Insulation 210
W Final Window 260